Since 1991 SPI has been providing design services in the areas of building planning and technical equipment design.
As a competent and efficient partner we develop best practices for the planning and implementation of your engineering and construction projects.

Our work is defined by high performance, flexibility, punctuality and a close business relationship with our clients.

Achieving the highest possible environmental and economic goals is of the utmost importance to us. Sustainable solutions to meet specific user requirements and individual needs are taken into account in our planning process.

News

  • October 2015 - Waste Water Treatment Plant in Görlitz

    The tender regarding the updating of the automation technology at the WWTP Görlitz has been completed successfully and the contract was signed. The construction work has started in the meantime.


  • July 2015 - Waste Water Treatment Plant in Brieske

    The preliminary planning process for the updating of automation and process control engineering has been completed. The further planning process provides for the replacement of the existing equipment in ongoing operation.


  • July 2015 - Optimisation of flood protection in Radebeul

    In Radebeul the existing rainwater overflow structure will be equipped with additional floodwater pumps. The low-voltage distribution will be adapted to the equipment. The necessary measurement equipment for controlling the floodwater pumps will be istalled. This project is being revised in the design planning.


  • June 2015 - Waste Water Treatment Plant in Görlitz

    The planning process for the updating of automation technology has almost been completed. The existing automation technology based on A250 / A120 will be replaced in ongoing operations within a very short time.


  • March 30, 2015 - Topping-out ceremony of the portal building of the Dresden University Cancer Center

    Representatives of the German Cancer Aid Organisation and the University Hospital Carl Gustav Carus celebrated together with the designers and craftsmen the topping-out ceremony for the portal building of Dresden University Cancer Center. The structural work of the building is completed after only 5 months and the remaining works are continuing. In the middle of the next year physicians will be treat first patients.


  • January 2015 - Saxon State Bureau for Road Construction and Traffic

    After finalized acceptances of the entire complex by the user, the Saxon State Bureau for Road Construction and Traffic was able to take possession of the facility at the end of December 2014. In January 2015, the staff moved into their new offices. For the first time all of the approximately 300 employees of the Bureau will be working in the same building.


  • December 2014 - Energy efficiency in the water sector of the Kingdom of Jordan

    We were commissioned to design the electical equipment for the renovation and automation of appoximately 100 deep wells and 20 pumping stations (200 kW to 2 MW) in the Kingdom of Jordan.


  • December 2014 - Dresden University Cancer Center of the University Hospital Carl Gustav Carus (UCC)

    Since its foundation in 2003, the UCC is housed in an existing building at the University Hospital. Funded by the German Cancer Aid Organisation, a new building will be constructed for further expansion, which is directly connected to the existing research, academic and office buildings. Our firm is already providing planning services for the entire electrical equipment. Since its foundation stone was laid in the fall of 2014, the construction progress is proceeding according to schedule.


  • November 2014 - Central Waste Water Treatment Plant (WWTP) in Chemnitz

    At the Central WWTP in Chemnitz the Siemens S5 automation hardware as well as the LSX process control system are currently being used. These will be replaced by newer generations in ongoing operations. The preliminary planning process has been completed.


  • 2014 - Central Waste Water Treatment Plant (WWTP) in Zittau

    This WWTP which was heavily damaged in the flood in August 2010 was provisionally re‐commissioned and then completely reconstructed using a flood‐proof design. In the meantime this WWTP has been fully re‐commissioned